The bridge in Elmbridge hasn’t been all it was cracked up to be for a long time.
Cllr Liz Townsend has been on the safety case since becoming the area’s County Councillor.
Concern has arisen over the safety of the bridge for years. HGV’s contractor vehicles have been pounding Elm Bridge daily on their way to large housing developments in the town in addition to the daily traffic.
Highway engineers took measures years ago to lighten the load by introducing one-way traffic with lights.

SCC says it doesn’t do private work, so if anyone offers to do any, contact Surrey Trading Standards at 0808 223 1133 or visit http://www.surrey.gov.uk/stopcoldcallers
Check with your operator for service alterations during roadworks if you use buses. http://www.surreycc.gov.uk/busoperators
The council’s contractor, Ringway, will do these works on SCC’s behalf.
http://www.surreycc.gov.uk/highways 0300 200 1003 Contact Centre, Dakota, 11 De Havilland Drive, Weybridge, Surrey, KT13 OYP.
If signs have been left behind, report it online at http://www.RemoveThisSign.com